CUSTOM MILLWORK & FINISH CARPENTRY · FENWICK CROSS · BY COMMISSION

Millwork with a hardware schedule, not a guess.

Wrensbank builds the permanent layers of a house — libraries, stair halls, paneled rooms and the doors your grandchildren will slam. Every commission carries a written hardware schedule, quartersawn stock, and three coats pre-finished flat before anything meets a wall.

Bench work 2023–2026

The portfolio opens the conversation

Six commissions from around Fenwick Cross, photographed at walkthrough — nothing staged, nothing graded, no borrowed furniture.

The Harrow lane library
The Harrow lane library — install morning, unit one
Crown run at the bench
Crown run at the bench — coped, numbered, sealed
Mortising a commission hinge
Mortising a commission hinge — hand-cut, per the schedule
The thirteenth winter chair
The thirteenth winter chair — one a year, by tradition
The long room set
The long room set — third coat, lying flat
Sign-off
Sign-off — the rail takes the ladder and the load

Services

The scope of the bench

01

Libraries & paneled rooms

Floor-to-ceiling cases with ladder rails, raised and flat panel walls scribed to plaster that stopped being flat in 1931. Drawn full-scale on butcher paper before one board is cut.

02

Stair halls

Treads, risers, scribed skirts and rail — rebuilt or new, with newels bolted through the frame. The one part of a house people trust with their whole weight, built like it.

03

Doors & passage, scheduled

Hung to a nickel-slide with a written hardware schedule: hinge count and finish, backset, knob or lever, per door — approved by you, then ordered once.

04

Window seats & conservatory pieces

Seats with drawers below, shutters and interior sashes built to the opening the house actually made — storage where the room needs it, none where it does not.

05

The annual commission

One piece of free-standing furniture a year — a table, a chest, a chair — when the bench calendar allows. Never rushed, never repeated, always numbered.

The schedule is the contract

Hardware, profile, finish and fit are written down before the first order is placed — and what is written is what is built. Where the drawing and the room disagree, the room wins and the drawing is corrected in ink, in your copy too.

How a commission runs

From conversation to walkthrough

Four movements, one bench, no handoffs — the hands that draw it are the hands that cut it.

1

The conversation & the measure

Ninety minutes at the house: the room lasered, the ideas sketched, the hardware discussed over tea. You leave with the sketches, whoever you hire.

2

The drawing & the schedule

Full-scale on butcher paper, with the hardware schedule beside it — hinge for hinge, knob for knob. Both are yours to mark up; both are signed before cutting.

3

Bench weeks

Quartersawn stock stickered and rested, then milled, coped and pre-finished flat in three coats. Crated in install order, numbered by room.

4

The install & the walk

Two to four quiet days on site, one room at a time. The walkthrough ends with the level, the lamp and a commission number stamped under the bottom shelf.

The bench ledger

15
years at the Fenwick Cross bench
409
commissions installed and stamped
1
free-standing piece built a year
100%
of stain-grade pre-finished flat
The hardware schedule arrived before the quote did — every hinge and knob for fourteen doors on one page. My architect asked to keep it as an example.
The Honan family · Library + door schedule, 2025
They scribed our stair skirts to walls that have been leaning since the canal was cut, and the joint lines are straight anyway. I do not understand it and I do not need to.
F. Dearborn · Stair hall rebuild, 2024
Commission number 409 is a window seat my daughters fight over every morning. Worth the wait, and the wait was worth it — the bench told us the calendar honestly from day one.
Marta & Jules Osei-Danquah · Window seat commission, 2026

The bench door

Asked before a commission opens

How far out is the bench?

Conmissions usually begin four to eight weeks after the measure — stairs and libraries are seasonal, doors and seats squeeze in sooner. The visit ends with real dates on paper, and we hold them; a bench that overbooks is a bench that starts lying about mornings.

Why a hardware schedule for a whole room?

Because hardware is where millwork projects quietly go wrong — mixed finishes, wrong backsets, hinges that arrive for a door that was hung for others. One page, approved by you, ordered once. It costs twenty minutes at the measure and saves the worst kind of Tuesday.

Which woods do you build in?

Quartersawn oak and walnut for most commissions, cherry and reclaimed fir where the room asks for them; paint-grade poplar and MDF only where paint will seal them honestly. Boards are stickered and rested at the bench before they are cut.

Can we live at home through the install?

Yes — one room at a time, plastic at the doorways, extraction on every tool, runners on every floor. Most installs run two to four days; the longest we ask anybody to live beside is a stair hall at one week.

Do you take repairs and small work?

Between commissions, yes — a sticking door, a cracked rail, a mantel that needs re-scribing. Small work is where the next library always comes from, and the bench treats it that way.

Open a commission

Bring the room, the measurement or just the idea — the sketches and the schedule are yours whoever builds.

(555) 648-9162

commissions@wrensbank.example · 1 Bench Court, Fenwick Cross · Lic. FC-59214

Start the conversation

We reply within one working day — usually sooner.