Concrete & exposed aggregate · Harrow Bend · one crew, licensed, since 2004

CONCRETE CRACKS. WE DECIDE WHERE.

Straightedge pours 4,000-psi air-entrained flatwork with the control-joint map drawn before the truck rolls — because a slab that cannot crack where you chose will crack where it wants to. Every rate on this page is per square foot, and every number survives daylight.

(555) 604-2213 · book@straightedge.example · 1,180 slabs placed across Harrow Bend and the toll-road valley

Pouring runs April through November. The 2027 calendar opens March 1 and the measure visits go in call order — March is usually spoken for by the thaw.

Services & rates

The rates — per square foot

Measured off your lot and held for sixty days. Forming, steel, finishing, jointing and wash-down live inside the per-foot number — the only extra we have ever charged is rock we could not see, and we telephone before we dig it.

Driveways, 5-inch slab$9.75

rebar grid · control joints on a 10-ft map · broom or aggregate

Exposed aggregate$15.50

seeded, washed and sealed at day 28 — the finish that forgives a leaf

Walkways & steps$11.25

4-inch slab · salt-finish treads · rail cores set before the pour

Garage & basement slabs$7.90

6-mil vapor barrier · fiber mesh · power-troweled

Control-joint sawingincluded

mapped on the plan, cut within twelve hours — never an extra

Checked, not claimed

The ledger on the office wall

22 yrs
one crew, never subcontracted
1,180
slabs placed, jointed and sealed
12 hrs
pour-to-sawed-joint, every time
$0
ever charged for a joint we had not mapped

Recent work

The slab book

Six pours from last season, chosen because each one shows a different finish doing its job. Ask on the phone and we will give you the street — our customers like their concrete more than we do.

Tollgate Road
Tollgate Road — 2,200 sq ft broom drive, joints on the 10-ft map
The Harrowside walk
The Harrowside walk — radius bays, salt-finish treads
Fenwick Grange
Fenwick Grange — exposed-aggregate court, river gravel
Brick-course border band around a stamped apron
Brick-course border band around a stamped apron
Kiln Yard
Kiln Yard — garage slab, power-troweled over vapor barrier
The quarry lot
The quarry lot — graded, formed and poured in one placement

How it goes

Form, pour, finish, cure

The same sequence on every job — the only variable is your project.

  1. Day 0

    Form & subbase

    Six inches of three-quarter-inch aggregate compacted in lifts and proof-rolled with the loaded truck. Forms pinned to the string line, rebar chaired, and the joint map drawn on the plan where you can argue with it.

  2. Day 1, 6 a.m.

    The pour

    One continuous placement — 4,000-psi air-entrained, five bags to the yard, batched at 5.7% entrained air. Screeded, darbied and edged while the sheen is still on the surface, because the sheen is the deadline.

  3. Hour +6

    Finish & the map

    Broom, expose or stamp; then the control joints sawed within twelve hours on the grid you approved. Movement lands in the groove we cut — that is the entire promise of this trade, and it is a promise about geometry, not luck.

  4. Day 28

    Cure & handover

    Sealed at full cure with a high-solid acrylic. Foot traffic at three days, the mower at five, vehicles at seven. The five-year joint-line warranty starts the morning you first park on it.

Straightedge was the only outfit that showed me a drawing of where the cracks would go. I thought that was a strange thing to be proud of until the neighbor’s slab, poured by someone else, did its own drawing.
G. Ferreol · 2,200 sq ft drive · Tollgate Road
They poured the courtyard between Saturday market and Tuesday opening. The joints are exactly where the plan said, and two winters of salt later the exposed aggregate still looks rinsed.
N. Achterkamp · Aggregate court · Fenwick Grange
A crew of four arrived at six, and the one who quoted was one of them. The number never moved a dollar. I have had kitchen renovations I cannot say that about.
G. & L. Whitcombe · Walk & steps · Harrowside

What the rate buys underneath

A slab is a roof over dirt. Ours sits on six inches of compacted aggregate, proof-rolled before a single form board is set — because concrete does not fix ground, it only reports on it, and we would rather read the report first.

Above the base: five inches for drives, four for walks, rebar on chairs at eighteen inches on centre, entrained air for the freeze-thaw cycle, and the joint map sawed inside twelve hours. None of it is optional, so none of it is an extra.

The five-year joint line

If a control joint spalls or the finish delaminates inside five years, we repair it — materials and labor. Concrete cracks; ours cracks where we told you it would.

Before you ring

Straight answers

When can we drive on it?

Vehicles at seven days, sealer and full strength at twenty-eight. Concrete makes roughly seventy percent of its strength in the first week — the calendar is chemistry, not a mood we are in.

So it WILL crack?

Every slab on earth moves. A jointed slab moves in the grooves: we saw within twelve hours of the pour, on a grid mapped to your slab’s geometry — usually every ten to twelve feet. The crack you never see is the one we sold you.

Do you color concrete?

Integral pigment in ten ranges, and exposed aggregate in three local stones. Both are batched at the plant, not dusted on top — the color goes through the slab, so a scratch cannot find a different colour underneath.

How small a job will you take?

About 200 square feet. Below that the truck minimums punish the per-foot price, and we will say so on the phone rather than pad the quote until it looks reasonable.

Winter pours?

Down to 40°F and rising, with hot water in the mix and blankets on the cure. Below that we re-book. A frozen pour is a warranty claim we would have manufactured ourselves.

Get your number.

Rough dimensions and a photo get you a per-square-foot estimate the same day; the site measure books inside the week. The phone is answered by someone who pours.