Road building · aggregate supply · trucking · Milkvale & the Winrow belt · the pit since 1979

Every road is a dirt job wearing a crust.

Milkvale builds private roads, lane upgrades and farm approaches out of its own pit — base laid in two compacted lifts, cut and fill balanced so the earthworks feed themselves, culverts set before the stone, and the trucks are ours down to the last axle. The figures come first on this page because they came first on ours.

47 mi
of private road built out of the Milkvale pit since 1979
82%
of our road jobs balanced on site — cut becomes fill
11
trucks and trailers on the yard clock, none brokered
2 lifts
of compacted base under every road we sign

Services & rates

The road sheet

Pit-owned aggregate, owned iron, owned trucks — the sheet is short because the chain is short. Every line is the stone, the haul, the compaction and the crown, in one number.

The 2026 sheet

New private road, built whole$14.50–19 / lin ft

Subgrade proofed, geotextile where wet, 8-in two-lift base, 2% crown, ditches tied

Lane rebuild, in place$9.80 / lin ft

Old surface and base reclaimed, regraded and re-compacted, new crown cut

Farm approach & field enterfrom $2,400

Culvert set or replaced, apron stoned, grade held to the county maximum

Culvert work, standing alonefrom $1,150

End sections, headwalls and bedding — the pipe is the road’s warranty

Aggregate delivered, pit-runfrom $21 / yd³

3/4-minus, blends and screened fill — our trucks, our scale, your tipping report

Trucking & equipment, hourlyfrom $118 / hr

End-dumps, water truck, dozer and roller with operators

3/4-minus base

The road stone, crushed and washed at the pit: two compacted lifts of it under every run we sign, moisture-corrected and rolled to 95 percent standard Proctor. Sold by the yard for your own builds, scaled on the pit bridge with a ticket for every load.

Screened fill

Pit-run and screened to minus three inches for building up low ground, filling old foundations and backfilling behind walls — placed, moisture-corrected and compacted to 95 percent standard Proctor when we place it, and sold loose at the scale when you do.

Crusher-run blend

Coarse run with fines left in, for wet-season tracks, yard pads and the first lift on soft ground — it knits, it drains, and it costs less than anything else that carries a truck. The farmer’s gravel, and half the Winrow belt is standing on it.

1

Walk the alignment

The route booted end to end: soils read at the soft stretches, drainage traced to where it wants to go, and the cut-and-fill balance sketched on the tailgate before anything moves.

2

Balance the earthworks

Cuts scheduled to feed fills — the roadbed built from its own ditch spoil wherever the arithmetic allows, and the truckloads that never ran are the cheapest ones on the job.

3

Water first, always

Culverts set, ditches cut to a fall, and the low stretches underdrained before a stone is placed. A road that cannot drain was built twice, once badly.

4

Two lifts of base

Eight inches total in two compacted passes — each lift watered, rolled and checked to 95 percent Proctor, the crown cut at two percent the whole run.

5

Top & tie

Surface stone to suit the traffic, approaches crowned to the county grade, and the first rain watched on site with you — the road’s first storm is its real inspection.

The sequence

How a road gets built out of a hole

The pit, the dozer and the trucks are all ours, so the sequence is the whole company on one alignment: earthworks balanced in the middle, water handled before the stone, and the base laid in two lifts that each get their own pass of the roller. A road built in this order is boring forever after — which is the point of roads.

2025 — 2026

The pit wall

Six runs and loads from the last two seasons. Four of these roads carry school buses now, which is the review that matters on the Winrow belt.

New road, Winrow Line
New road, Winrow Line — 2,900 ft, balanced, two lifts, crowned
Load-out at the pit
Load-out at the pit — 3/4-minus on the scale, ticket printed
Dozer pass, the Miller flats
Dozer pass, the Miller flats — cut feeding fill the whole run
Culvert day, Cooper creek
Culvert day, Cooper creek — pipe set before the stone, always
Roller pass, the depot lane
Roller pass, the depot lane — second lift at 95, watered
Rock stretch, Ridge road
Rock stretch, Ridge road — hammered, vased, based in one open

Build season runs May to freeze-up · pit loads six to five, Saturdays to noon · (555) 056-8823 · pit@milkvaleroadbed.example

One fleet, one clock

The trucks are ours, and it shows on the sheet

Brokered trucking is where road quotes go to become road invoices: somebody else’s schedule, somebody else’s rate, and a fuel surcharge with your name on it. Every axle that serves a Milkvale road is on our clock, insured on our policy, and printed on one sheet you signed at the start.

11
trucks and trailers, owned outright
1
invoice from first cut to final roll
24 t
per load, scaled at the pit every time
0
brokered axles on a Milkvale job, ever

Roads and their owners

The Winrow belt says

Our lane was a Clayton county joke — two feet of mudshirt every spring. Milkvale balanced the cut into the fill, laid two lifts of their own base, crowned the whole run and set the culvert before the stone, exactly in that order. Three Aprils later the school bus turns around at our gate without slowing down.
R. and S. Ouimet · New road, 2,900 ft, Winrow Line
The quote came with the cut-and-fill arithmetic on it — I could see where every yard was coming from and where it was going. The low bid trucked; Milkvale walked the dirt across the site and billed me for the walking. The road is four years old and dead flat.
H. Grebner · Rebuilt lane, the Miller flats
We buy base by the load for the farm tracks and the scale ticket has never once argued with the sheet. Crusher-run on the wet stretches, 3/4-minus on the pads, their trucks, their driver who knows which gate opens which way. A pit that runs its own scale honestly is worth twenty dollars a load.
D. Alcott · Aggregate customer, Cooper creek

The four regulars

Asked at the pit gate

The four every road call starts with. If yours is not here, the scale house answers six to five and Saturdays to noon, and the person in it has built road in your township.

Why does a private road cost by the foot?

Because a road is a system with a length — subgrade, base, crown, ditches and culverts, all of them repeating. A per-foot price forces the arithmetic into the open: you can compare quotes line by line, and you can see exactly what the cheaper quote stopped including at the point it got cheaper.

How thick should the base actually be?

Eight inches compacted for car and pickup traffic on decent ground, more where the buses or the grain trucks run or the subgrade is soft — and always in two lifts, because a roller reaches honest density through about four inches at a pass. A single eight-inch dump compacts at the top and stays loose at the bottom, and loose at the bottom is where roads go to die.

What does balancing the job really save?

On a rolling alignment, regularly a third of the earthwork cost. Every yard of ditch cut that becomes roadbed fill is a yard that was not loaded, hauled, tipped and replaced with bought stone — and on the Winrow hills, the arithmetic is usually visible from the kitchen window. The balance sheet rides on the quote.

Do you build in the wet part of the season?

Foundations of a road, yes — culverts, underdrain and the first lift on firm ground. Finishing base in a soaking week compacts wet, and wet-compacted base is what frost heaves for a living. We sequence around the sky instead of arguing with it, and the sheet price survives the reschedule.

May build calendar opens in March · pit loads six to five, Saturdays to noon · (555) 056-8823

Bring the alignment, take the arithmetic

Length, what it carries and what the ground does in a wet month. We walk it, balance the cut against the fill, and the sheet is the quote — stone, haul, compaction and crown in one number. pit@milkvaleroadbed.example

Excavation — Billboard Roadbed — Crusher-Loud Grape — V2