Aldergate Fence & Gate · Marlow Bend & Fenwick · Est. 2004

A gate that swings true in its tenth autumn.

Cedar and chain-link fences built the slow way: hand-set posts, concrete below frost, boards spaced by eye and checked by level. Marlow Bend and Fenwick, since 2004.

Licensed & insured · WC-88412 · (555) 472-9083 · gate@aldergatefence.example

Services & rates

Rate card, autumn 2026

Per running foot, installed — posts in concrete below frost included in every line, no asterisks. Your fixed quote follows the walk of the line.

Western red cedar privacy, 6 ftfrom $36/ln ft

1×6 boards, 4×4 posts at 8 ft centres

Cedar picket, 4 ftfrom $24/ln ft

dog-ear or gothic, same posts

Galvanized chain-link, 6 ftfrom $21/ln ft

9-gauge, tensioned top rail

Black vinyl-coated chain-linkfrom $27/ln ft

the one that disappears in a garden

Double drive gate, 12 ft cedarfrom $2,800

welded hinges, adjustable latch

Walk gate, 4 ft cedarfrom $640

hung, latched and tuned

Posts to 42 inches

Concrete below the frost line on every post — corners and gates first, not last. A fence is a post job with boards on it; we budget the digging accordingly.

Fifteen-year warranty

On workmanship: gates that stay true, boards that stay fastened, lines that stay straight. Transferable when the house sells.

One crew, one line

The two who set your posts are the two who hang your gate. No handoffs, no sub crews, and the same voice on the phone for twenty years.

Marlow Bend · Fenwick

Lines from the ledger

Three lines from this year's book. The ledger at the shop counter lists all three hundred and forty — ask and we will find you the one nearest your road.

The Hartley garden
The Hartley garden — coated chain-link, Fenwick
Old mill race
Old mill race — cedar picket, Marlow Bend
Dusk on the Coyle line
Dusk on the Coyle line — lit gate posts

How it goes

How a fence goes up

The same sequence on every job — the only variable is your project.

  1. Day 1

    Walking the line

    We walk it with you, flags in hand, and price what we see — the slope, the rock, the rhododendron you would rather keep. The quote is written the same day and holds for sixty days.

  2. Days 2–5

    Lines & locates

    The plat pulled, 811 called, the string set a board-width inside your marks. Boring paperwork — and the entire difference between a fence and a lawsuit.

  3. Week 1

    Posts & concrete

    Augered to 42 inches, plumbed and braced, concrete mixed on site rather than poured dry and hoped at. The line cures over a weekend before a rail ever touches it.

  4. Week 2

    Rails, boards, gates

    Rails crowned, boards spaced to a pencil width and checked every tenth by level, gates hung on welded hinges and tuned twice — once that day, once a month later.

  5. Handover

    The month-later visit

    We come back after the first hard rain, re-tune every gate and hand over the warranty card with the line's measurements on it. That visit is free, always.

Our gate opened with one finger the day they left, and still does — two autumns later. They came back after the first storm like they said they would, tightened two hinges and refused the coffee money.
E. Hartley — 96 ft cedar and a garden gate, Fenwick
340
fences in the ledger
42 in
post depth, corners included
15 yr
workmanship warranty
2004
the same two founders

Sensible questions

How long will the fence last?

The cedar boards, thirty years with a wash and a stain every five or six. The concrete and the line — longer than either of us will be arguing about it. The warranty covers fifteen of those years in writing.

Can you follow a slope?

Cedar does it with a racked line or stepped panels — your call on the walk. Chain-link racks naturally, and aluminum panels handle about three feet of fall in ten. We price the slope we can see, never an average.

What about the neighbour's side of the line?

We build a board-width inside your marks, every time. If your neighbour wants to share the line we will happily build the better two-sided fence — but that conversation is yours to have before the auger arrives.

Do you remove the old fence?

Yes, and haul it — as its own line on the quote, never folded into the foot price. Most old lines around here are rotted at the post, which is exactly the part we are pickiest about.

Estimates walked and written the same day · Marlow Bend, Fenwick and the valley between · (555) 472-9083 · gate@aldergatefence.example

Walk the line with us.

Call, or send the address and the footage. A written quote the same day, fixed for sixty days, and a start date you can plan a garden around.