Sutcliffe & Roan Floodplain Works · Tearney Bend & the Low Meadow · Est. 1996

The river will come back. The basement doesn’t have to.

The Bend re-crests on average every 5.2 years and the meadow keeps the receipts. Sutcliffe & Roan hardens the low houses: exterior membranes where the grade allows the dig, interior drains and redundant sumps where it doesn’t, and injection for the cracks the last flood opened. We work the flood calendar, not the sales calendar.

Crest season runs March to June — inspections are FREE for 30 days after any crest over the Bend gauge. Duty line, flood season hours: (555) 026-7749.

The Sutcliffe & Roan doctrine

Flood hardening, not mopping

Anybody can shop-vac a basement the morning after. We make the next crest a non-event: move the water before it arrives, seal the paths it already found, and pump what remains with a system that assumes the power quits at the worst hour of the storm. Free post-crest inspections are how thirty years of Bend houses ended up on our calendar.

The crest clause

Any seal, drain or pump system we install is warranted for ten years against water through the part of it we touched — and if a crest beats it inside that window, the re-repair is ours and the inspection of everything else is free. Written against the installation log, not the weather report.

Move it — grade & daylight

The cheapest gallon is the one that never arrives: swales regraded, downspouts extended, window wells drained, and — where the lot allows — a gravity line to daylight. On the Low Meadow this is half of every hardening job and the first quarter of every quote.

Seal it — membrane & injection

Exterior dimple membrane where the dig can reach, urethane injection for the cracks the last crest opened, and seals at the cold joints floodwater pushed through for six hours. Sealing against hydrostatic pressure only works when the pressure itself is managed — so the seal rides with the drain.

Pump it — the 2+1 system

Mains primary, battery secondary on its own float, an alarm that texts two phones, check valves both sides, and a gravity overflow for the storm that outlasts the batteries. Floodplain math is simple: the power quits exactly when the water peaks, and one pump is a bet you lose on schedule.

Posted since 2004

The rate card, flood edition

The same card the van doors carry, reprinted each crest season. The $280 crest inspection is free inside thirty days of a flood and credited to any work the rest of the year.

Crest inspection & map$280 flat

Moisture map, crack gauges, pump cycle test — free post-crest

Interior drain & sealed basin$57 / lin ft

Channel at the footing, 2+1 pumps, alarm, check valves

Exterior membrane & dig$95 / lin ft

Open to footing, dimple board, stone, grade restored

Urethane injection$94 / lin ft

Flood-opened cracks, gasketed flexible seal

Battery secondary & alarm retrofit$1,180 set

Added to an existing basin, its own float and battery

Gravity overflow to daylight$840 run

Where the lot allows — for the storm that beats the pumps

How it goes

The flood calendar

The same sequence on every job — the only variable is your project.

  1. The crest

    The free inspection

    Thirty days after any crest over the gauge, we read the low houses for nothing: tide lines, crack gauges, the sump cycled and timed. You get the map whether you spend anything or not.

  2. The drying month

    The reading settles

    Once the meadow dries, the full survey: moisture map against the tide lines, injection marked crack by crack, the dig-or-drain decision drawn against your actual grade.

  3. The works

    The hardening

    Grade and daylight first, seals second, the 2+1 basin last — in the order water arrives. One crew the whole way through, and plastic to the stairs every night of it.

  4. The trial storm

    The exam

    The first big rain after install is the test we set ourselves. We ask every household for one photo: the floor, the morning after. Dry is the report we file.

  5. The year after

    The anniversary

    Pumps tested on battery, alarm fired on purpose, tide lines checked against the map. The Bend gets a full crest cycle before we call a basement hardened.

Tearney Bend, 2025 — 2026

Hardened houses

Six low houses from the last two crests, photographed the morning after the storm that would have had them.

Bend gauge house
Bend gauge house — membrane, drain, 2+1 basin
Low Meadow dairy
Low Meadow dairy — 26 staples after the flood bowed it
Millrace cottage
Millrace cottage — injection on the crest-opened crack
The ferry house
The ferry house — tide-line map before the works
Meadow Lane
Meadow Lane — gravity overflow run to daylight
Sutcliffe & Roan
Sutcliffe & Roan — the 1996 van, still first on the gauge
Three crests, three ruined basements, three insurance arguments. Then Sutcliffe & Roan: swale and downspouts in a morning, the drain and the two-pump basin across one week, the gravity line the month after. The fourth crest came in March, the power quit at 2 a.m., and the alarm texted us while the battery pump was already handling it. The floor was dry in socks at seven. That is the entire review.
G. Hardesty-Roan — Bend gauge house, Tearney Bend

The works, in figures

5.2 yr
average between crests over the gauge’s record
1,060
low houses hardened since 1996
2+1
pumps, battery and alarm on every close
30 days
post-crest inspection window — free
They told us the gravity overflow was the line the last crew never pulled — and the March storm proved it: power out for nine hours, battery pump past its duty, and the water left by the front walk instead of through the floor. The photo they asked for hangs in their office now. The floor was dry.
M. Tallow · Full hardening, Meadow Lane
Our wall bowed in the flood and two outfits quoted full replacement. Sutcliffe gauged it, strung it, stapled it — twenty-six staples and a coat of paint, and the re-string a year later read identical. Nobody here works the flood calendar like they do; nobody else even keeps one.
The Okabe family · Staples & survey, Low Meadow dairy
The free inspection after the crest got us; the rate card kept us. Every line item did exactly what the map said it would, the crew rolled the sheeting to the fence nightly, and when the next crest came the alarm sang and the battery pump sang back. I recommend them to every neighbour above the gauge and below it.
R. Persimmon · Drain & retrofit, the ferry house
Can anything truly waterproof a floodplain basement?

Against the river itself, no — nothing below the gauge line is dry while the water is over it. What hardening does is make the ordinary crest a non-event: managed water, sealed paths, pumped remainder, power-out redundancy. The houses that called us after every rain stay dry through every crest but the once-a-decade one — and that one becomes a mop, not a rebuild.

Interior drain or exterior membrane on the Bend?

The grade decides. High lots with clean access get the exterior dig — stopping water at the wall is the stronger promise. Low lots, shared driveways and mature gardens get the interior drain and the 2+1 basin — pressure relieved, floor managed, nothing outside touched. The survey prices both wherever both are live options.

What happens when the power quits mid-storm?

Exactly what the 2+1 system was built for: the secondary pump is on its own battery and its own float, the alarm texts two phones, and the gravity overflow — where the lot allows — carries what the pumps cannot. The design assumption is that everything electrical fails at the worst hour; the basement does not care.

Is the free inspection really free?

For thirty days after any crest over the gauge, yes — map, gauges and pump cycle, no invoice, no follow-up call unless you ask for one. It started as flood triage in 1998 and stayed because hardened basements start with a reading, and readings blocked behind a fee do not get done in the month that matters.

How do I know if my house is below the gauge line?

The county publishes the crest map and we keep the gauge history in the van — your address answers it in a minute on the phone. Below the line, we will talk honestly about managed water and raised systems instead of selling you a membrane the river will introduce itself to.

The duty line

Flood season runs long hours, the crest list jumps the calendar, and the same crew that reads your house installs the works. If water is arriving today, call before you fill the form — triage beats paperwork. flag@sutclifferoan.example

Free inspections 30 days after every crest · duty line, flood season hours · (555) 026-7749 · flag@sutclifferoan.example

Before the next one

Tell us what the last crest did — the tide line, the crack, the hour the pump quit. Post-crest inspections are free for thirty days, and the reading comes off any work that follows. flag@sutclifferoan.example