Plumbform Concrete · Fortner Prairie & the grid roads · Serving builders since 1998

The pour is the day everything else sits on.

Footings, stem walls, monolithic slabs and ICF — formed, reinforced, placed and cured to the drawing, for the builders of the prairie. Staked from the plan and not the eye, scheduled against the ready-mix plant and not the forecast, and tested: slump at the truck, cylinders at seven and twenty-eight days, so the engineer signs once and the framers get a floor that is actually flat.

The pour is the day everything else sits on.

Plumbform, by the yard ticket

4,100
pours placed since 1998 — footing to final slab
±3 mm
the slab tolerance we power-trowel to
28-day
cylinder breaks on every structural pour
0
change orders for weather we saw coming

Off the truck, 2025 — 2026

Recent pours

Six placements from last season — the finished floors, photographed before the framers and the finishers got to dress them up.

Section 41 duplexes
Section 41 duplexes — 38 footing runs, one morning
The grain co-op annex
The grain co-op annex — 6,400 sq ft of warehouse slab
Molander ICF bungalow
Molander ICF bungalow — walls stacked, ready to fill
Grid Road 40 shop
Grid Road 40 shop — six-inch, fibermesh, heavy racking
Prairie Rise infill
Prairie Rise infill — stem walls keyed and cured
The Plumbform yard
The Plumbform yard — cylinder reports, filed by pour

The pour programs

Three ways to buy the concrete

Builders on the prairie run different crews, different banks and different calendars — so the concrete comes three ways, and the rates under all three come off the same sheet the office sends to the plant.

Footings & stem walls

$46/ lin ft formed & poured

  • Staked from plan, checked twice before the truck rolls
  • Rebar on chairs, never on grade
  • Keyway and anchor bolts to the drawing
  • Engineer-stamped letters available per pour

Grid-road mileage included to mile sixty.

Most poured

Monolithic slab

$9.20/ sq ft, 4,000 PSI

  • Ten-mil vapour barrier, taped seams
  • Fibermesh plus perimeter rebar
  • Power-troweled to ±3 mm
  • Control joints sawn at 12 ft centres
  • Cure-and-seal, winter blankets option

Thickened edges and porch drops quoted off the plan.

ICF & crawl walls

$21/ sq ft of wall

  • Blocks stacked, braced and checked plumb
  • Rebar to the engineer’s letter
  • Placed in lifts, not one terrifying drop
  • Bracing left standing for the framer

Openings bucked to your window schedule.

What we do

What the flat rate actually buys

The stakeout nobody skips

The stakeout nobody skips

Batter boards, string and a rotary laser, checked against the plan twice — once before we dig, once before we form. The cheapest centimetres in construction are the ones got right before the iron arrives, and the dearest in the world are a footing poured a hand-width out. We measure like the concrete is coming that morning, every time, because one day it is.

Reinforcement on chairs, joints on a plan

Steel sits on chairs at the drawn height, laps spliced to schedule, and the control joints are walked and chalked before the saw ever starts — at openings, at re-entrant corners, on the twelve-foot grid. Concrete cracks; the only choice anyone gets is where, and that choice is made with chalk, not luck.

Reinforcement on chairs, joints on a plan
Cured like the spec sheet is watching

Cured like the spec sheet is watching

Slump at the truck, cylinders cast and broken at seven and twenty-eight days, cure-and-seal down before the wind takes the water out of the surface. A slab that dries instead of curing dusts, crazes and argues with every floor the owner ever glues to it. Ours get a week of babysitting built into the rate, and the breaks come back to your inbox.

The pour week

From plan to power trowel

The same five days on every job — the only variable is what the drawing and the sky agree on between us.

1

Stakeout & dig

Plan checked, batteries set, spoil hauled the day the trench opens — prairie mud is a scheduling problem before it is a soil one.

2

Form & place steel

Forms braced to a string, steel chaired and tied, sleeves and inserts for the plumber confirmed by text before the truck is booked.

3

Pour day

One placement per pour — a cold joint inside a footing is a confession. Trucks sequenced with the plant, slump checked at the chute, not after the argument.

4

Finish & joint

Power trowel to tolerance, control joints sawn the same day the surface allows, anchor bolts and hold-downs set while the arithmetic is still wet.

5

Cure & report

Cure-and-seal or blankets by forecast, cylinders broken on schedule, and the placement report — tickets, slump, breaks — emailed the evening the truck goes home.

Ninth house with Plumbform, and the reason is boring: the slab is flat, the bolts are where the plan says, and the report lands in my inbox before I have driven home. My framer square-checks their work out of habit and has stopped telling me the results, because they are always the same.
Dean Kolchak · Kolchak Builds, Section 41 duplexes
They poured our warehouse floor in two placements on a Friday and a Monday, flat enough that the racking contractor asked who had done the F-numbers. Six inches, fibermesh, joints exactly where the drawing wanted them — and the forklift has never found a joint it did not like.
The grain co-op board · Annex slab, Fortner
Our ICF builder vanished mid-stack and Plumbform took the walls over — braced them, checked the rebar against the engineer’s letter, and placed in lifts while I watched the pump operator treat it like a Tuesday. The letter came back in three days and the inspector signed on the first visit.
M. Molander · ICF bungalow, Prairie Rise

Before the booking call

What builders ask first

The five every booking call gets to within a minute. Anything else, the office answers the number at the foot of the page six to five, and the plant takes questions after that.

How late in the season can you pour?

Into November with hot water at the plant, blankets on the load and a heated enclosure below minus five — quoted up front, never as a surprise. The calendar closes when the cylinders stop making strength, not when we get tired: a wall that froze overnight is a wall somebody pays to remove, and we do not sell those.

Do you work off our engineer’s letters?

That is most of the book. We place exactly what the letter specifies — bar size, lap, chair height, lift height on ICF — and we flag the letter before the pour if something on site disagrees with something on paper. The engineer hears it from us while it is still a note, not after it is a claim.

What does the per-foot rate include?

Stakeout to forms to finish: dig on level ground, forming, steel, placement, power trowelling, control joints, cure-and-seal, anchor bolts and the placement report. Exclusions are three and always printed: rock or shale, over-excavation ordered by an engineer, and mileage past grid-road sixty.

Can you hold a pour date for a closing?

We hold the plant slot, not the sky. A booked date moves for weather once at no charge — the second move is a scheduling conversation. In twenty-eight seasons no builder has been handed a wet floor and a shrug, and the ones on their tenth house with us are the proof that matters.

Chutes or a pump?

Chutes to about mid-site, a line pump past it, a boom pump for ICF and anything the truck cannot reach — priced on the sheet, decided at the walk. The pour plan names the method before the concrete is batched, because a drum only waits so long and concrete does not forgive a debate.

The 2027 pour calendar opens in February · plant slots reserved ten days out · (555) 031-2890 · pour@plumbform.example

Price the pour

Send the sheet number or the address and we will walk it, quote the program off the plan and hold a plant slot. Builders get the rate sheet by email the same day; homeowners get the same sheet — there has only ever been one. pour@plumbform.example