Bluepoint Basement Systems · Hollow Creek & Fenwick County · Est. 2006

We would rather put the numbers up front.

Walls straightened, basements dried, piers torqued to refusal and logged — and every job metered before a tool leaves the truck. The figures on this page came off finished work, and the rate card behind them is the same card everybody gets.

640
bowing walls straightened since 2006
2,870
basements dried — drains, sumps, membranes
25 yr
transferable warranty on every pier we torque
0
repairs sold without a written survey first

What we do

What we install

Wall straightening

Wall straightening

Steel channel bolted from slab to joists at eight-foot centers, carbon-fiber staples stitched across the failure, and the deflection measured with the same string line before and after. The wall is held where it stands instead of being pushed, cracked and called fixed.

Interior perimeter drains

A channel cut inside the footing, collection at every cold joint and window well, all daylit into a sealed sump with a battery-backed pump and a high-water alarm. The water never reaches the floor because it never gets the chance — and nothing outside gets dug.

Interior perimeter drains
Helical pier underpinning

Helical pier underpinning

For footings that have lost bearing: steel shafts screwed down to strata that can carry the house, bracketed under the footing one lift at a time. Every pier's torque is logged, the log goes home with your invoice, and the twenty-five-year clock starts on the whole row.

How it goes

Measure, then report, then repair, then monitor

The same sequence on every job — the only variable is your project.

  1. Day 0

    The measurement

    A zip-level laser survey of the slab, crack-width gauges on every fracture, moisture readings along the walls, and deflection strings across anything bowing. You keep the raw readings whether you hire us or not.

  2. Days 2–4

    The report

    An engineer-reviewed document: photographs, an elevation profile of your slab, a movement map of every crack, and the repair — or none — that each one asks for. The quote sits on the last page, and it is a ceiling, not an opening bid.

  3. Weeks 2–4

    The repair

    Piers torqued to refusal with the log handed over; staples epoxied into stitched slots; the perimeter drain cut at the footing and daylit into a sealed sump. One crew, one system at a time, plastic run to the street every night.

  4. Month 12

    The monitoring

    Tell-tale monitors stay on the walls and we come back to re-run the elevation profile. If anything we repaired has moved, the re-repair is ours — which is exactly why the report was so thorough.

Fenwick County jobs

From the county, 2025 — 2026

Six jobs from last year's book, photographed at sign-off with the readings still on the wall. Ask for the address — owners of dry basements like proving it.

Milldam school annex
Milldam school annex — sump with battery backup, sealed lid
Hollow Creek colonial
Hollow Creek colonial — 52 ft of epoxy on a cold joint
Ash Hollow farmhouse
Ash Hollow farmhouse — port map before the injection
Fenwick grain store
Fenwick grain store — 22 staples and channel steel
The Bluepoint yard
The Bluepoint yard — drain daylit into the sump basin
Chapel Road bungalow
Chapel Road bungalow — eleven piers, torque log in hand
The wall had moved 44 millimetres in eight years and two companies wanted to rebuild it. Bluepoint strung it, graphed it, drove eleven piers under it in a week, and came back at month twelve to re-run the profile — same numbers as the day they left. The door upstairs closed for the first time since we bought the house.
E. Vanderkamp — Ash Hollow Road, Fenwick County

The county, in figures

48 hr
emergency pump response, county-wide
14 mm
median wall deflection when people call us
11
piers under the average underpinning
6 wks
survey to sign-off on the typical repair

Why the ledger

A fixed number, measured twice

A foundation quote moves for one reason: the contractor priced the wall from the doorway. We gauge every crack, string every bow and profile the slab before the number is written — then it sits still through the job. The month-twelve re-measure goes on our calendar before the crew leaves your driveway.

The re-measure clause

Twelve months after every repair we return and re-run the elevation profile. Anything we repaired that has moved gets re-repaired at our cost. The clause has been exercised twice in nineteen years, and both times it was ours to carry.

Free second opinions on any competing quote · (555) 018-6623 · dry@bluepointbasement.example

Put your house on the ledger

Tell us what the wall, the floor or the dehumidifier is doing. The survey is $285, it comes off any repair we then do, and the readings are yours whatever you decide. dry@bluepointbasement.example