Brickwork & repointing · Dunstan Ferry · Est. 1976

OLD BRICK. NEW MORTAR. NO SHORTCUTS.

Bellwether repoints the river town’s walls in natural hydraulic lime the brick can breathe through, hangs veneer on stainless the framing can rely on, and rebuilds arches on centering the geometry approves of. Forty-nine seasons on the same three streets.

Services & rates

Rates — pointed, hung, rebuilt

Quoted after the survey and held sixty days. Lime, anchors, scaffolding and cleanup live inside the number — the only extra is salvage brick we must buy, quoted per thousand before you approve a single unit.

Lime repointing$17–$23/sq ft

hand-raked joints · NHL 3.5 in the field, NHL 5 at copings

Brick swap-out$21/sq ft

era-matched salvage, bedded and struck in lime

Anchored stone veneer$34/sq ft

stainless Z-anchors at 16 in o.c. · flashed and wept

Arch rebuild on centeringfrom $1,850

voussoirs numbered · keystone set last

Hearth in firebrickfrom $2,400

moderate- or high-duty to the drawing · cast crown

Forty-nine seasons

The bell we still answer to

2,300
elevations repointed since 1976
0
grinders ever pointed with, on purpose
16 in
stainless anchor spacing, every veneer
25 yr
workmanship warranty, in writing

What we do

What the rates buy

The repoint, by hand

Joints raked to twice their width with chisels, never ground, then flushed full in two passes with lime matched to the chip from your wall. Struck to the original profile — flush, weather-struck or bucket-handle — whatever the wall was born with, read from the elevation before we mix.

The repoint, by hand
Veneer, hung like it means it

Veneer, hung like it means it

Stainless Z-anchors and dowel pins at sixteen inches on centre, dovetailed into a scratch-and-double-back coat, with base flashing and weep vents so water leaves at the bottom instead of touring the wall. Anchors are the wall; the stone is the coat the wall wears.

Arches, on centering

Timber centering bent to the drawn curve, voussoirs numbered and laid from both spring lines, keystone set last, centering struck only after the ring closes. An arch is a argument with gravity that geometry wins — provided nobody rushes the mortar.

Arches, on centering

Recent work

The river-town wall book

Six jobs from around the ferry landing — walls, arches and hearths, every one drive-pastable. Ask on the phone and we will give you the street; the town likes showing off its brick more than we do.

Ferry Street
Ferry Street — 1902 common brick, full NHL 3.5 repoint
The Sail Loft
The Sail Loft — segmental arch, numbered voussoirs, new keystone
Tanner’s Row
Tanner’s Row — veneer anchored and flashed, weeps at the base
The levee wall
The levee wall — rebuilt coursed rubble, drained behind
Methodist hall
Methodist hall — parapets in NHL 5, copings re-bedded
The Anchor Inn
The Anchor Inn — hearth re-laid in high-duty firebrick
Three bids arrived. Two quoted a grinder and a price; Bellwether quoted a chisel, a lime bucket and a start date — and told me the grinder would have ruined the arris I was paying to keep. The wall is now the best thing on the street, which on Ferry Street is a proper contest.
M. Grieg · full repoint & arch rebuild, The Sail Loft, Dunstan Ferry

How it goes

Survey to strike

Four movements, the same on every wall in the ferry town — the survey sets the lime, the wall sets the pace, and the warranty runs twenty-five years from the last strike.

1

The survey & the chip

A mortar chip leaves an inconspicuous joint and gets matched; you keep a written square-foot number, held sixty days. The wall’s age picks the lime, the chip picks the colour.

2

Rake by hand

Joints opened to twice their width with chisels and vacuumed clean — no grinders on this crew, not once in forty-nine seasons.

3

Point in two passes

NHL 3.5 in the field, NHL 5 at copings, flushed full with the first pass stiffened before the second, struck to the profile the wall was born with.

4

Cure, strike, warrant

Carbonation finishes under mist and covers; the final brush at leather-hard, then twenty-five years signed into your name.

Get the number first.

Send the year, the street and a photo — the square-foot estimate comes back the same day, and the survey with the chip kit books within the week. The phone is answered by someone who points.

Masonry Contractor — Billboard — Signal Red — V2