Phase-finishing contractors · Grangeholm & the development plain · since 2009

We paint behind the tapers, ahead of the walkthrough.

Aster & Iron is the finishing phase on a build schedule: colour consistent across forty units, super-matte walls that shrug off buyer walk-throughs, and a punch list that closes before your PDI, not after your closing date. One contract per phase, one superintendent’s number that answers.

Phase contracts from $7.20 per metre · PDI touch-up crews booked ten days out · colour batch-matched across the run · phases@asteriron.example

First finish going on a new build floor
164
phases delivered
Grangeholm plain since 2009
40 units
one colour, one batch
matched across the whole run
10 days
PDI touch-up booking
quoted at contract, not after
0
walkthrough reschedules
laid at our finish, ever

Services

The three phases we take

Frame-out colour on a new floor

Frame-out colour

The first finish: primer systems specified to the board type, ceilings sprayed flat and back-rolled, walls in the builder super-matte your buyers will scuff-test with a sleeve. Whole floors per week, colour by batch number, so unit forty matches unit one under every lighting angle the showhome tour uses.

Trim & doors phase

Trim sprayed in the sheen your design centre specced — satin rails, semigloss doors — then hung, aligned and tipped by hand where the gun cannot be trusted. Edge-rolled backs, labelled hardware, no orange peel anywhere a buyer runs a thumb. The flats get the gun; the edges get the truth.

Trim phase spraying
PDI touch-up walk

PDI & touch-up crews

The unglamorous phase that sells all the others: after the trades, before the buyer — every wall raked with a lamp, every scuff and swipe touched from the labelled batch tins, every unit walked twice and signed off on a card your superintendent keeps in the site file.

Rates

The phase sheet

Metre rates for the phases above; the run decides the total, and the total is fixed at contract. Batch-matched colour and the PDI crew’s booking are not extras — they are lines, so the closing date is a number, not a hope.

Prime & first finish, per metre$7.20

Board primer, flat spray, back-rolled

Builder super-matte, per metre$10.80

Two coats, batch-matched across the run

Trim spray, per linear metre$6.40

Satin or semigloss, hung and tipped

Ceiling flat, per metre$5.90

Sprayed and back-rolled, zero sheen

Garage & common walls$4.10

Contract-grade eggshell, one shift

PDI touch-up crew, per day$940

Two painters, batch tins, lamp walk

Colour consult, design centreincluded

Palette card per elevation, buyer-safe

Punch-list closureincluded

Signed card per unit, photographed

How it goes

From frame to closing gift

The sequence is the schedule — we hold the dates the way we hold the colour.

  1. Week 0

    Spec & batch

    Board types read, primer systems matched, and the colour run batched in one order — batch numbers on the tin, on the spec, and on the sign-off card your super keeps.

  2. Frame-out

    First finish

    Ceilings flat, walls primed and first-coated floor by floor behind the tapers. Extraction at every station, because the units sell with the air as much as with the walls.

  3. Trim phase

    Spray & hang

    Doors and trim sprayed, hung on their own hardware, and tipped by hand at every edge. The gun does the flats; the brush does the truth — buyers run thumbs along edges.

  4. Pre-PDI

    The lamp walk

    Every unit raked with work lamps, scuffs touched from batch tins, and the punch list closed on a card — before your buyer walks it, not after your closing moves.

The wall

Runs we finished on schedule

Harvest Mews
Harvest Mews — forty units, one batch, one autumn
The Granaries
The Granaries — trim phase, semigloss by design centre
Rookfield
Rookfield — PDI week, lamp walks at six in the morning
Candle Yard
Candle Yard — super-matte surviving its third buyer walkthrough
Foxglove Row
Foxglove Row — consult palette card, one per elevation
The Old Mill conversion
The Old Mill conversion — frame-out behind the tapers

Word of mouth

Three supers, three closings

Phase two of Harvest Mews: forty units, one colour, zero variation under three different lighting angles. The design centre took the credit. I let them.
Saul Abernathy · Site super · Harvest Mews
Their PDI crew found scuffs I had walked past twice. The buyers walked a finished unit on the first date we ever promised anyone, and my punch list closed the same week.
Gemma Trask · Project manager · Rookfield
The batch-tin system is the whole trick — touch-ups come out of the same paint the wall was born in. Two years on, the common halls still look like closing day.
Aldous Rée · Developer · Foxglove Row

The closing-date clause

The finish date is on the contract with the touch-up crew already booked behind it. If our phase runs long and moves your PDI, the touch-up crew is ours to pay for — the clause has been exercised twice in sixteen years, and both supers got the call before their buyers did.

Fair questions

Do you work to our spec or yours?

Yours, translated: we read the board type and the design-centre sheen schedule and write the primer system underneath it. If your spec has a hole — vinyl over fresh compound, say — we flag it at week zero, when it costs a line item, not a delay.

How do you keep colour consistent across a run?

One batch order per colour per run, batch numbers on every tin, and touch-ups only ever from the batch tin labelled for that unit. Colour-matching across batches is a renovation skill — forty units standing side by side get one birth batch, full stop.

Can you keep up with a fast track?

That is the trade: floor-by-floor first finishing behind the tapers, trim crews that start before the floors are down, and a PDI crew booked ten days out from your walkthrough whether or not anyone believes the schedule.

What is builder super-matte, really?

A scrubbable flat formulated for exactly this abuse: buyer sleeves, furniture deliveries, toddlers in year one. It holds the matte look the sales brochure promised while wiping down like an eggshell — the spec we put in every run we finish.

Who fixes the trades’ damage?

We photograph it, price it off the sheet, and fix it — in that order, with the invoice going to whoever dented it. The PDI crew carries batch tins precisely so the wall never knows the difference.

Bring us the schedule.

Send the phase dates and the unit count. The spec comes back inside a week with the primer system named, the batch plan written, and the touch-up crew already pencilled ten days behind the last coat. phases@asteriron.example

Spec the phase

Sixty seconds now; a spec sheet next week.

One reply about your phase, nothing else.