Commercial asphalt · per-ton bids · Carroway & the Mulberry belt · est. 2009

We bid in tons. We invoice in tons. The variance is half a percent.

Squareyard paves lots, streets and industrial yards on plant-ticket arithmetic: a takeoff you can audit, a tonnage bid against it, and a closeout that reconciles the two to the pound. Every figure on this page came off a ticket with a job name on it.

2.9M sq ft
taken off, laid and reconciled since 2009
34,000 t
placed on plant tickets, ticket for ticket
±0.5%
the only variance a Squareyard invoice has carried
17
seasons on the Carroway belt

01 · The takeoff

Square footage from the plan set or the tape, multiplied by depth and converted at 145 pounds a cubic foot — the same page whether the job is a 900-foot drive or a distribution yard. You keep the page; it is the yardstick everything else answers to.

02 · The ticket

The plant weighs every ton onto the truck with your job name printed on the ticket, and the tickets ride in the driver’s window to your site. Tons delivered is tons delivered — not tons estimated at a tailgate meeting.

03 · The true-up

Closeout reconciles the takeoff against the tickets, line for line, and the invoice is the smaller of the arithmetic. In seventeen seasons the gap between bid and bill has never crossed half a percent — and half of that is tack and waste, budgeted in the open.

The per-ton bid sheet · 2026

Binder course, in place$86–94 / t

1.5-in intermediate lift, laid and compacted — includes haul from the Carroway plant

Wearing course, in place$104–118 / t

1-in surface lift, 31% RAP mix, joints matched hot

Streets & collectors$128–146 / t

Per-ton in-place bid with curb protection, sweeping and traffic control

Full-depth reclaim$2.00 / sq ft

Existing drive and base ground into new base in place — per square foot

Striping, beaded$0.76 / lin ft

4-in lines at 15-mil wet latex, glass beads, layout to plan

Mobilization & traffic controlfrom $1,850

Flat, quoted ahead, waived on jobs over 400 tons

The unit is the honesty

Why tons, not feet

Square feet hide thin mats; tons cannot lie — the plant weighs them. A per-ton bid says exactly how much asphalt is arriving at your site, the ticket proves it arrived, and the depth you were promised is division you can do yourself.

How it runs

From plan set to true-up

1

Walk the takeoff

Plan set or tape, cores on anything over 5,000 square feet, and the length-times-width-times-depth page written while we stand on your lot.

2

Core & classify

Base sound means overlay dollars; base failed means reclaim or rebuild dollars — the core log says which, before the bid does.

3

Bid the tonnage

Tons by lift against the sheet above, tack and waste in the open, mobilization flat and waived past 400 tons.

4

Phase & cutover

Traffic keeps moving around the work — phase lines planned to hot joints, night cutover where daytime cannot run.

5

True-up & handover

Tickets against takeoff, invoice against the smaller number, and the reconciliation page stapled to the front of the closeout.

The reconciliation band

What ton-for-ton bidding looks like when it comes back from the plant.

112
full-depth lots rebuilt on ticketed tonnage
218 t
largest single-day lay — 12,000 sq ft at 3 in, two plants
±0.5%
bid-to-invoice variance, the ceiling, not the average
0
invoice lines a customer has had to ask us to explain

2025 — 2026

Ticketed and open

Six jobs from the closeout shelf. Every photograph has a reconciliation page behind it with the same job number in the corner.

Mulberry belt yard
Mulberry belt yard — 218 t in a day, two plants running
Carroway crossing
Carroway crossing — overlay phasing, one lane always open
The lay, freight row
The lay, freight row — binder at 86 dollars the ton, ticketed
Paver and roller, the depot
Paver and roller, the depot — hot joint down the phase line
Breakdown roll, school annex
Breakdown roll, school annex — density before the mat cools
Twin drums, Fifth street
Twin drums, Fifth street — collector rehab closed out at dusk
I have bought pavement three ways — by the square foot, by the hour and by the ton — and the ton is the only unit the vendor cannot round in his own favour. Squareyard’s closeout put 4,180 ticketed tons against a 4,160-ton takeoff and billed the takeoff. My controller framed the reconciliation page, which is not a sentence I expected to say about asphalt.
V. Anand-Merchant — site superintendent, Carroway freight row

Streets & tight windows

Paved overnight, open at six

A collector cannot close for a week and a school lot cannot close at all. We mill, lay and stripe under lights and weekend flags — plant coordination, cones, sweepers and the wearing course down before the first bus. Monday morning finds lines, beads and nothing else.

The window is the contract

The cutover plan goes out with the bid: which nights, which lanes open at six, where the flaggers stand and what the weather fallback costs — flat, quoted ahead, and waived on jobs past 400 tons like everything else on the sheet.

Before the bid goes out

Purchaser’s questions

The four that come back on every request for quote. If yours is not here, the estimating desk answers its own line inside a working day.

How do I know the tonnage on the invoice is real?

Because you already hold the other two documents. The takeoff shows the arithmetic, the plant tickets show what was weighed onto the trucks, and the true-up reconciles them line for line — copies of all three ride with the closeout. The plant’s scale is calibrated by the county, not by us.

What does 31% RAP do to my pavement?

Nothing you would find on a core report except a better price. Reclaimed asphalt is asphalt and aggregate that already exists; plant blending at thirty-one percent tests at or above virgin designs on the mixes we buy, and it decouples half your bill from the price of a barrel. The batch ticket prints the percentage every load.

When is reclaim the wrong answer?

When the failure is drainage rather than structure — a mat holding water because the grade never worked, not because the base is gone. Reclaim rebuilds structure; it does not create fall that was never cut. The core log tells us which one you are holding, and the bid says so in writing before anything is ground.

Do you bid public work?

Yes — municipal street and parking RFPs across the belt, bid per ton in place with the same sheet. The takeoff method, the ticket trail and the reconciliation are the parts public procurement likes best: there is nothing to negotiate after the trucks leave, because the scale already decided.

Takeoffs turned around in two working days · (555) 035-6638 · takeoff@squareyardpaving.example

Send the plan set, get the takeoff page

Plans, a sketch, or an address and a rough square footage — the arithmetic starts the same. Takeoff in two days, cores inside the week, and the bid in tons with the sheet attached. takeoff@squareyardpaving.example