Northmark Exteriors · Kittridge, Bolvar & the Wren River valley · Since 2006

Every claim we make is a measured wall.

Northmark quotes, hangs and warranties by number: walls measured flat, openings counted, fasteners set to the manufacturer’s wind table, and every figure printed on the quote you sign. Tear-off to bare sheathing, wrap and flashings before a board, a 10 mm rain-screen gap behind every course — itemized, not implied.

830
valley walls measured, hung and filed since 2006
0
overlays installed — not one, not ever
3/16″
sealed butt joints, the width the manual draws
100%
of quotes itemized: tear-off, wrap, flash, hang, caulk, sweep

Services & rates

The itemized card

Last season’s valley rates, itemized the way the invoice will be. Travel inside the county is not a line, because it is not a charge.

Fiber-cement lap, installed$9.00–11.60 / sq ft

5/16″ Hardie, 6.25″–8.25″ exposure, blind-nailed, ColorPlus or primed

Insulation-backed panel, installed$11.20–13.60 / sq ft

Continuous insulated core, R-3–R-5 at the stud face, track-hung

Engineered-wood lap or panel$7.10–8.55 / sq ft

Treated strand core, primed, two site-sprayed coats

Trim, casing & corners$9–13 / lin ft

4/4 and 5/4 cement, joints left 3/16″ and sealed

Soffit & fascia$10–15 / lin ft

Ventilated runs, wrapped fascia, insect- and wasp-blocked

Wrap, flash & rain-screen$1.85 / sq ft

Lapped and taped WRB, integrated flashings, 10 mm battens, screened weeps

How it goes

The sequence, counted

The same five counts on every job, printed on the schedule before day one.

1

Count the wall

Measured flat, openings counted, the fastener schedule drawn from the manufacturer’s 130 mph table — before the quote, not after.

2

Close it in

Tear-off to sheathing, repairs priced ahead, wrap lapped, taped, cap-nailed, flashed at every opening. Watertight by nightfall.

3

Hang the count

Starter to a laser, blind-nailed on gauge, exposure checked every course — 6.25, 7.25 or 8.25, as ordered.

4

Seal the joints

Butt joints cut clean, left 3/16″, sealed flexible. Tight joints crack; drawn joints move with the valley’s seasons.

5

File the papers

Magnet sweep, touch-up kit, and both warranties registered the same week — five years labor, up to thirty finish.

2025 — 2026

Filed walls

Kittridge colonial
Kittridge colonial — lap at 7.25″, ColorPlus Evening Blue
Bolvar farmhouse
Bolvar farmhouse — insulated panel, R-4 at the stud face
Wren River cottage
Wren River cottage — batten field, matched 1909 profile
The valley co-op
The valley co-op — commercial panel, 8.25″ exposure
Kittridge double
Kittridge double — one hang, mirrored trim studies
Bolvar schoolhouse
Bolvar schoolhouse — storm take-out, full elevation

The paperwork

Why itemized beats estimated

An estimate rounds in the estimator’s favor and hides the two lines that matter — sheathing repair and flashing count. The Northmark quote itemizes both, prices the repair band before the tear-off finds it, and carries the fastener schedule on its second page. When a manufacturer’s inspector measures our wall against our paper, the two agree.

The five-year count

Fastening, flashing, sealing and every caulk joint, re-done free inside five years — and the itemized quote is the checklist we audit against. The manufacturer carries the board to thirty; we carry the hang; you carry the folder.

The ledger, in figures

830
valley walls hung and filed since 2006
2–3 wk
typical whole-house hang, storm days printed in
130 mph
fastener schedule on every quote’s second page
19
years the same two crews have run the valley
The quote had a line for fasteners. A line, for fasteners. My brother the inspector read it twice and told me to sign it before they came to their senses. The wall went up in fourteen days, exactly as itemized, and the folder is in the fireproof box.
Garnet Ashby · Full re-side, Kittridge
Hail in June, scope in the adjuster’s format by Friday, full elevation agreed without a supplement. The itemized count of broken boards — forty-one — was what carried the claim. That number did the arguing.
Winn Holloway · Storm claim, Bolvar

Before you open a file

Questions with numbers for answers

The five every first call reaches. If yours is not here, the desk line runs seven to five, valley-wide.

What exactly is a fastener schedule?

A table from the manufacturer’s manual: fastener type, count and placement per board for a given wind rating — Northmark builds to the 130 mph line. It is printed on the second page of the quote, and it is what a warranty auditor measures to after a storm. Most quotes never mention it; ours leads with it.

Why refuse overlays?

Because the arithmetic fails: an overlay adds a second layer of nails into old material, traps moisture against the sheathing, and voids the fastener schedule the finish warranty depends on. The measured cost of tearing off is a line on our quote; the unmeasured cost of not tearing off is somebody else’s invoice at year eight.

Is the insulated panel worth the number?

On a river-facing wall, the figures that matter are R-3 to R-5 continuous at the stud face and the siding on its own track — warmer and quieter, measured in the first winter. On a sheltered wall we print both numbers and take the smaller sale. The ledger keeps us honest.

How do storm scopes work?

We photograph every strike from our ladder, count the broken boards, and write the scope in the adjuster’s format — measurement, cause, code, line by line. You file it, we meet the adjuster at the wall, and nothing is torn off until the number is agreed. The count is what carries the claim.

What if the schedule slips?

Storm days are printed into the calendar as buffer, and a slip is a phone call with a new date attached — not a surprise. The wrap is the weather skin from close-in onward, so an open Northmark house is a dry house while the calendar catches up.

Measures inside 48 hours · storm scopes inside 24 · (555) 036-7733 · desks@northmarkexteriors.example

Open the ledger

Measure the wall, file the number

Town, wall age, and whether this is want, wear or weather. The measure is free and the itemized quote follows the wall, not the mood. desks@northmarkexteriors.example