COLD SWITCH INDUSTRIAL SNOW & ICE · FERROW JUNCTION · PLANT, RAIL & DOCK DUTY

The plant runs the storm out. So does the snow program.

Private plant roads, rail sidings and loading docks, kept serviceable through storms that close the county: Type II anti-ice down while the pavement is dry, switch points and heel blocks cleared by hand because a blade would wreck them, and a duty log initialed every four hours from first flake to final pass. The municipality does not enter private trackage. We live there.

STORM DESK (555) 047-2258 — answered by the duty driver, not a service, from the first flake to the final wheel report. Plants on 24-hour duty are never queued behind a phone call.

Storm event clear

$380per event

  • Plant roads and one siding cleared to pavement
  • Dock faces and leveler pits opened
  • Treated salt on throats and shift-change walks
  • Wheel report photographed and filed by 6 a.m.
  • The same rate at 2 a.m. as at noon
Most yards

Siding & road season

$2,640Nov – Apr

  • Unlimited events at the one-inch trigger
  • Type II brine before every named storm
  • Switch points and heel blocks hand-cleared
  • Stack rows built to the October map, hauled when they fill
  • A February that buries the Junction changes nothing

Plant 24-hour duty

from $1,880per month

  • Continuous cycle on the process road, storm-long
  • Fire lanes and assembly points kept black
  • Duty log initialed every four hours
  • Emergency page answered by the driver holding the shovel

Why the trade is different

A siding is not a driveway with delusions

A driveway forgives. A switch point does not: one blade edge through a point machine is a four-figure repair and a stalled shunt, and a heel block left in a gauge line turns a fifteen-minute move into a Friday. Cold Switch clears rail by hand — points, heel blocks, gauge lines, heater cables checked while the crew is down there anyway — and saves the iron for the roads, where iron belongs. The liability maths is just as lopsided: your insurer reads “private trackage, not municipal right-of-way” and starts asking who exactly stands behind the duty log. This company is the answer to that question.

The duty log, initialed

Through every contracted event the duty driver initials the log every four hours: roads, points, docks, salt down, photographs. The log is the document your insurer and your shortline dispatcher both ask for, and it is written the night it happens, not the morning after.

How it goes

One storm, watch to wheel report

The same sequence on every job — the only variable is your project.

  1. T-36 hours — the brine run

    Type II down while it is dry

    When the forecast firms, the tank truck runs the plant on dry pavement — corrosion-inhibited Type II on roads and aprons only, never on rail steel. Pre-treating after the snow starts is watering a plant in the rain, and on trackage it is worse than useless.

  2. The trigger — one inch

    The duty driver logs on

    One inch on the process road starts the clock. Season yards get the first pass inside three hours; duty plants get a continuous cycle that does not wait for anything as passive as a trigger.

  3. First pass — roads & fire lanes

    Circulation before the shift change

    The process road, the fire lanes and the assembly points go black first, because a shift change on an icy plant road is the most expensive fifteen minutes in the county. Dock faces follow before the first trailer drop.

  4. The sidings — by hand

    Points, heel blocks, heater cables

    Two crew members walk each contracted siding with shovels, brooms and a curl of heater cable: points cleared to moving metal, heel blocks broken out, gauge lines broom-finished. No blade ever touches a point machine.

  5. By morning — the wheel report

    Time on, time off, salt, photos

    Every address on the book gets its report before 6 a.m.: passes with timestamps, gallons of brine, tonnes of treated salt, one photograph per work face. The same file an adjuster would request in March, filed the night it happened.

The conveyor does not care that it snowed. Last February the sky dropped eleven inches on Ferrow Junction overnight and the offload was set for 6:40, and I stood at the window at four expecting to phone around. The Cold Switch loader was already on the process road — the duty driver had been cycling it since midnight — the points were broom-clean by half past five, and the trailer backed onto the dock face at 6:15. The wheel report was in my inbox before the coffee was. That is not a contractor. That is a piece of the plant.
V. Andreissen — plant engineer, feed mill on the Cinder Row trackage, sixth season on duty

Switch points & heel blocks

The work that built the company: points cleared to moving metal by hand, heel blocks broken and hauled, heater cables inspected on every visit, gauge lines broom-finished so the first move after a storm is a non-event. A stalled shunt costs more per hour than our whole season.

Dock faces & leveler pits

Trailer drops start at five on the Row, so the faces start at three: aprons to bare, leveler pits drained and open, dock seals uncut by any blade that ever wandered close. The approach throats get treated salt at the refreeze hours, logged like everything else.

Plant roads & fire lanes

The process road, the fire lanes, the assembly points and the tank-farm loop: continuous cycle on duty plants, three-hour first pass on season yards, stack rows built to the October map and hauled when the map runs out of room. The shift change never meets ice.

Storm events, 2025 — 26

The night roster

Six faces from the duty logs — iron where iron belongs, hands where hands belong, and a plant that opened on time behind every one of them.

Staging at the Junction yard
Staging at the Junction yard — duty cycle begins at 23:40
First pass on the process road, feed mill shift change
First pass on the process road, feed mill shift change
The blower opening dock approaches before the five o’clock drops
The blower opening dock approaches before the five o’clock drops
Hand crew at the east siding
Hand crew at the east siding — points and heel blocks
Type II tank on dry pavement, 30 hours ahead of the band
Type II tank on dry pavement, 30 hours ahead of the band
Two-person finish, the Cinder Row crossing and its shelter
Two-person finish, the Cinder Row crossing and its shelter

Nine winters of duty logs

The book, in figures

16 mi
of private plant road, siding and dock face on the book
3 hr
first-pass standard from the one-inch trigger
180 t
treated salt and brine staged before the first frost
0
shift-change closures on a contracted plant, nine winters
Our shortline fined us twice for heel blocks left in a gauge line before we switched. Cold Switch has walked the same siding for six winters now, and the dispatcher’s inspector has gone from a menace to a coffee date. The hand-clear line on the invoice is the cheapest rail insurance in the county.
D. Okoye-Fenwick · Yard manager, Cinder Row transload
The dock seals were the argument — the previous operator’s blade cut two in one season at nine hundred dollars apiece. Cold Switch opens the faces with the loader held short and finishes by hand, and in three winters we have replaced zero. The wheel reports read better than our own shift logs.
S. & P. Aldana · Warehouse leads, cold storage on the Junction spur
I called at 1:50 in the morning during the February event because a fire inspector was coming at eight. The voice that answered was steering with one hand. The lanes, the assembly points and the tank-farm loop were black by six, and the log was initialed every four hours exactly as promised. My insurer asked for a copy of the format.
R. Braithwaite-Osei · Plant engineer, fabricators on Trackage 4

The four we always get

Asked across the duty desk

Anything heavier, the storm desk answers any hour weather is actually happening — or the form below reaches the same desk by morning.

Why can’t the municipality just clear us?

Because private trackage and plant roads are not their right-of-way, and their liability counsel knows it even where their plows could physically reach. The county clears to your mailbox; everything past the fence line — roads, sidings, docks, fire lanes — is yours to keep serviceable, and one stalled move or missed shift costs more than our season. That gap is the entire company.

Is brine safe around rail steel?

Not raw salt brine, no — chlorides and rail steel are old enemies. That is why our Type II is corrosion-inhibited and why it only ever touches roads, aprons and throats. Rail-side ice is a hand-and-broom problem by rule, and the switch heaters carry the overnight load. The duty log records which fluid went where, by the gallon.

What exactly is a wheel report?

The closeout every contracted event files before 6 a.m.: each pass with time on and time off, brine gallons, salt tonnage, and one photograph per work face. It is written for the two people who will eventually ask — your insurer in March and your dispatcher the morning after — and it has settled both kinds of conversation without a single meeting.

Do you take residential driveways?

No, and pretending otherwise would make us worse at the work that pays for the iron. A driveway is honestly served by the route contractors we drink coffee with at the Junction diner — ask the desk and we will name two.

Season yards are walked and mapped in October; the book closes when the duty drivers are spoken for · storm desk (555) 047-2258 · ops@coldswitch.example

Put the yard on the book

Gate address, roughly what sits inside it — road miles, sidings, dock faces — and when your shifts change. That is the whole quote; the October walk is free and the storm desk answers the first night you need it. ops@coldswitch.example