Foundations

Everything rests on this.

Foundation work approached with a complete view of the site, structure and sequence. The unseen beginning of something lasting.

New foundations

Footings and foundation construction coordinated with the project’s engineering and site requirements.

Existing structures

Assessment-led repair scopes and specialist coordination where structural work is required.

Site & sequence

Access, excavation and construction staging considered alongside the concrete and reinforcement.

A structure begins below the finish
A structure begins below the finish
Ground conditions shape the work
Ground conditions shape the work
The foundation of a complete building
The foundation of a complete building

The ground is never a blank page. Good foundation work begins by understanding what is already there.

1

Establish the conditions

Site information, drawings and the existing structure define the starting point.

2

Coordinate the plan

Engineering, access and the work sequence are aligned before construction.

3

Build & document

The agreed installation, inspections and records form part of the handover.

Can you tell what a crack means from a photograph?

A photograph can help begin the conversation, but an on-site assessment and, where appropriate, engineering advice are needed to determine the cause and scope.

Do you work from engineered drawings?

Structural work is coordinated with the applicable design and approval requirements for the project.

We’ll use these details to respond to your enquiry.

Bedrock Foundations — Foundations